Detailed Design for Gwangmyeong City Aging Sewer Rehabilitation Project [Phase 3]
ClientGwngmyeong City
Year2022 - 2024
LocationGwangmyeong, Korea
Scale
Excavation replacement L= 2,021m
Sewage box section repair 1,138m
1,595 locations for partial maintenance
The purpose of this project is to address the nationwide phenomenon of ground subsidence (commonly referred to as sinkholes) occurring and increasing in urban areas, causing public anxiety and becoming a social issue. In response to the possibility of ground subsidence, this project aims to conduct a detailed investigation of aging or defective sewer pipelines that may contribute to ground subsidence. The goal is to prevent ground subsidence caused by sewer pipelines and establish a systematic and rapid response system by investigating relevant data and the condition of pipelines. The ultimate objective of this project is to formulate a ground subsidence response plan.