ENGINEERING
Power
Transmission Grid
Detailed Design for Hwaseong Area(Seo seoul2-Bongdam) Power Cable Tunnel Construction
ClientKorea Electric Power Corp.
Year2020 - 2021
LocationHwaseong, Korea
Scale
Size : 154kV Transmission Line(2Circuits)
Total Length : L = 1,206m
- Semi Shield(Ø=2.4m) : L = 273.29m
- Box Culvert(B 1.8m x H 2.15m) : L = 44m
- Duct(Ø=175x1m,Ø=200x7m) : L = 889.71m