List
List
ENGINEERING
Water
Sewerage
Detailed Design for Integrated Improvement of Sewer System in Yeouido Drainage Sector
ClientYeongdeungpo-gu office
Year- 2010
LocationSeoul, Korea
Scale
Pipe new installation : 10.025㎞,
Pipe renewal : 9.67㎞, etc : Manhole, Street inlet
The purpose of this task is to carry out a detailed design for the Yeouido drainage basin, based on the "Noryangjin Sewerage Survey and Basic Design (December 1999)" implemented according to the comprehensive sewerage maintenance plan promoted by Seoul City. The goal is to improve the performance of under-functioning and inadequate pipes and to ensure efficient wastewater treatment through specialized technical services.