List
ENGINEERING Water Water Resources

Detailed design for river environment maintenance project in Seokhyeon district of Yeongsan River

ClientYeongsan River Basin Environmental Office

Year2023 - 2025

LocationJeonnam, Korea

Scale 4 embankment reinforcement (L=4.71㎞)
Bridge re-construction and construction of 3 bridges, demolition of 1 bridge

  1. #Domestic
  2. #Jeolla-do
  3. #WaterResources
  4. #River
List