Detailed design for the Sewer Pipeline Installation Project on Songbae Village (Songbae 2-gil)
ClientBugang Construction Co., Ltd
Year2024 - 2024
LocationCheongyang, Korea
Scale
New Sewage Pipeline: 643m
Establishment of Manhole Pumping Station : 1 location
Drainage Facilities: 11 locations
This project aims to prevent water pollution in the discharge streams and improve the living environment for local residents in Songbae Village (Songbae 2-gil) within the Jungang 3 treatment area of Jeongeup City. The necessity for water quality improvement has arisen due to water pollution caused by sewage discharge. The project involves the installation of a separate sewage pipeline and a manhole pumping station in Songbae Village (Songbae 2-gil), as well as the refurbishment of drainage facilities. These measures will direct sewage to the Jeongeup Public Sewage Treatment Facility for treatment, thereby preventing water pollution in the discharge streams.