List
List
ENGINEERING
Transport
Highway / Airport
Detailed Design for Yeongdong Expressway ( Ansan-Buksuwon) Widening Construction
ClientKorea Expressway Corporation
Year2017 - 2019
LocationAnsan, Korea
Scale Road length(L)=7.42km, Width(B)=37.8~45.0m, Tunnel 1Nos/840m, Bridge 7Nos/489.4m
This task is to reduce logistics costs from Bonpo-ri, Homyeong-myeon, Yecheon-gun, Gyeongsangbuk-do to Suhwa-ri, Jibo-myeon, Yecheon-gun, to provide transportation convenience for users, and to carry out the implementation design of existing road improvement projects for balanced regional development