Feasibility Study and Preliminary Design for the ESS safety Evaluation with Demonstration Center
ClientHanwha Energy
Year2022 - 2023
LocationWanju, Korea
Scale
Site Area: 16,653.9㎡
Capacity: Solar Power 899.64kW, Energy Storage System(ESS) 1,092.824kWh, Fuel Cell 440kW
This project was conducted for the establishment of a "Renewable Energy Integrated ESS Safety Evaluation Center" at the Electric Safety Research Institute of the Korea Electric Safety Corporation (KEPCO). It aimed to facilitate the smooth construction and integrated operation of demonstration facilities for energy technology development projects, including solar power, energy storage systems (ESS), and hydrogen fuel cells. This demonstration facility is the first of its kind in South Korea, and it proposed the selection of various measurement equipment that complies with the six safety standards developed as part of this technology development project. It also suggested the optimal arrangement of the demonstration facility.