List
ENGINEERING Water Sewerage

Master Plan for Sewerage System in Gangjin County and Sewerage Maintenance Service

ClientGangjin County

Year2021 - 2024

LocationGangjin, Korea

Scale 1) Shinjeon Songcheon Water Supply Project
Expansion to 20 tons per day, Sewer Pipeline Length: 8.4 km, Drainage Facilities: 263 locations

2) Marang Public Wastewater Treatment Plant Expansion Project
Expansion to 270 tons per day

3)Gangjin Seoseong Treatment Subdivision Sewer Pipeline Improvement Project
Sewer Pipeline Length: 23.6 km, Drainage Facilities: 828 locations

The revision of sewage system improvement basic plan guidelines, along with the reassessment of medium to long-term sewage projects in response to various development initiatives underway in Gangjin County, aims to enhance sewage coverage systematically and strategically. This is intended to increase the sewage coverage rate for the future, contributing to the healthy development of the local community, improved public hygiene, and the preservation of water quality in public waters

  1. #Sewerage
  2. #Jeolla-do
  3. #Domestic
List