List
List
ENGINEERING
Water
Waterworks
Master Plan for Water Supply System, Cheongyang
ClientCheongyang Country
Year2015 - 2017
LocationCheongyang, Korea
Scale
Target Population: 27,400,
Target Area: 479.21㎢
Based on the Water Supply Basic Plan Establishment Guidelines (September 30, 2011, Ministry of Environment), the basic plan was revised to address changes in water sources and supply systems, as well as to develop water supply measures in response to industrial water demand, for an area of 479.21 square kilometers with a water supply population of 27,400 people by 2035. The plan includes step-by-step project plan adjustments in accordance with government policy.