List
ENGINEERING EIA Post-EIA

Post-Environmental Impact Survey for Incheon Metro Line 1 construction of Geomdan Extension Line (at the time of construction)

ClientIncheon Metropolitan City

Year2020 - 2025

LocationIncheon, Korea

Scale Length: 6.825km

An environmental impact assessment was conducted for the railway project connecting the north and south regions of Incheon Metropolitan City. The purpose of this project is to establish a low-carbon green transportation infrastructure to improve regional transportation, enhance the convenience of citizens' transportation, and boost the competitiveness of the Geomdan New City.

  1. #Domestic
  2. #Railway
  3. #Post-EIA
List