Preliminary and Detailed Design for Cheonho-1 Sogu Subarea Sewer Pipeline Rehabilitation Project
ClientSeoul City
Year2022 - 2024
LocationCheonho, Korea
Scale
Site Area : 204.82ha
Route Survey : 39.6㎞
Soil Investigation : 3 locations
Flow and Water Quality Assessment : 5 locations
Total Length of Targeted Pipelines : 74.8㎞
The purpose of this is to derive improvement measures for enhancing the functionality and quality of sewage pipelines and to establish detailed construction and maintenance plans to realize these improvements.