List
ENGINEERING Water Sewerage

Preliminary and Detailed Design for Emergency Maintenance of Decrepit Sewage Pipelines(1st phase)

ClientDaejeon Metropolitan City

Year2017 - 2018

LocationDaejeon, Korea

Scale Urgent Replacement for decrepit sewer: L= 19.9km
-Whole replacement 18.1km
-Partial replacement 1.8km

The purpose is to conduct the basic and detailed design for the improvement of the existing aging sewage pipelines in certain areas of Dong-gu, Seo-gu, and Yuseong-gu. This is necessary to prevent soil and groundwater pollution due to the elapsed service life and connection point leaks of combined sewage pipelines. It also aims to prevent the intrusion of unknown water sources, such as river water, into the pipelines, which can lead to increased influent flow and reduced treatment efficiency, resulting in higher treatment costs.

  1. #Sewerage
  2. #Domestic
List