ENGINEERING
Power
Electrical
Preliminary and Detailed Design for Establishment and Extension of Sewage Treatment Plant in Seokdae and Sicheon
ClientSancheong County
Year2020 - 2022
LocationSancheong, Korea
Scale
Seokdae STP(Establish) : Q=1,200㎥/day
Sicheon STP(Extension) : Q=850㎥/day
Facility scale:
-Community Sewage Facility
-380V/220V low receiving voltage
The purpose is to perform basic and detailed design for the installation of environmental infrastructure in response to untreated domestic wastewater discharge from Bangmok-ri, Susans, and Seokdae-maeul. This will help mitigate contamination of nearby public water bodies, including the protection zones of water supplies, and address the increased sewage generation due to population growth in Sicheon-myeon and its vicinity.