List
ENGINEERING Water Sewerage

Preliminary and Detailed Design for Extension of Wastewater Treatment Plant in Mupung and Three Other Districts

ClientMuju County

Year2017 - 2020

LocationMuju, Korea

Scale Expansion of WWTP in Mupung (Q= 100㎥/day)
Construction of WWTP in Chimok and Chudong (Q= 80, 40㎥/day) and Sewer(L=21km)

This project is aimed at managing sewage generated in several areas, including Yongpo-ri in Muju-eup, three other areas in Anseong-myeon, Hyunnae-ri in Mufung-myeon, and Goemok-ri in Jeokjang-myeon. The project involves expanding the Mufoong sewage treatment facility by 100㎥/day, establishing the Chimok sewage treatment facility with a capacity of 80㎥/day, and creating the Chudong sewage treatment facility with a capacity of 40㎥/day. Additionally, 21.0km of sewage pipelines have been improved to contribute to water quality protection at discharge sites and improve the living environment for residents.

  1. #Sewerage
  2. #Jeolla-do
  3. #Domestic
List