Preliminary and Detailed Design for Gangbuk to Amsa Water Transmission System Interconnection (Long-term Continuation)

ClientSeoul City

Year2023 - 2024

LocationSeoul, Korea

Scale Installation of Transmission Pipeline Connecting Gangbuk Water Treatment Center and Amsa Water Treatment Center, Diameter D1,650㎜, L=5.1km (Including 0.9km of Underpass)

The purpose is to conduct basic and detailed design for the connection project between Amsa Water Purification Plant, which has become obsolete after 35 years since its construction, and Gangbuk Water Treatment Center, in order to supply the required water quantity for the reconstruction of Amsa Water Purification Plant.