Preliminary and Detailed Design for Guri-si Metropolitan Phase 3 Water Transmission Pipeline Improvement Project
ClientGuri City
Year2025 - 2025
LocationGuri, Korea
Scale
Regional Water Supply System Phase 3 – Transmission Pipeline Connection
Obstacle and direct investigation
Test pit excavation: 1 lot (5 locations)
Water supply route survey: 0.6 km
Due to frequent leakage accidents caused by the aging of the Phase 3 regional water supply transmission pipeline, a review was conducted on constructing a new water supply pipeline or applying trenchless construction methods to ensure stable water supply. Through the improvement of the transmission pipeline, this project aims to secure transmission stability, restore pipeline functions, enhance tap water supply service levels, and contribute to the realization of water welfare.