Preliminary and Detailed Design for Gwangju Songjeong-Suncheon Railway Construction Section 5

ClientKOREA NATIONAL RAILWAY

Year2023 - 2025

LocationSuncheon, Korea

Scale Length L=19.262㎞
Earthwork L=7.155㎞
Bridge L=0.415㎞
Tunnel L=7.990㎞
Existing line L=3.702㎞
4 Bridges, Length: 185m