ENGINEERING
Transport
Geotechnical / Tunnel
Preliminary and Detailed Design for Jungang Railway Section 1
ClientKorea Railway Network Authority
Year2012 - 2014
LocationDanyang, Yeongam, Korea
Scale
Earthwork 6.2㎞, Bridge 2.3㎞(13place), Tunnel 2.0㎞(6place), Station(1place)
Slope Stability
The double-track railway project connecting Dodam to Yeongcheon is an undertaking aimed at addressing the increased rail traffic volume, alleviating the capacity shortage on the railway line, and reducing travel time. The project involved performing basic and detailed design work for the first section of the project.