List
List
ENGINEERING
Power
Electrical
Preliminary and Detailed Design for Maintenance of Sewage Pipelines Around Gusan
ClientChangwon City
Year2020 - 2022
LocationChangwon, Korea
Scale
Sewer : 35.6km
Drainage equipment : 1,500ea
Facility scale:
-Manhole Pumping Station
-380V/220V low receiving voltage
The purpose is to adequately treat wastewater in the area of Gusansan-myeon, Masanhapoho-gu, Changwon City, contributing to the improvement of urban outskirts living conditions and public hygiene. Additionally, it aims to enhance the water quality of Masan Bay.