Preliminary and Detailed Design for Maintenance Project of Decrepit Sewer Pipelines in Pocheon area and Expansion of pocheon 2 Public treatment Sewage Facility
ClientPocheon-si
Year2023 - 2024
LocationPocheon, Korea
Scale
Expanshion of Sewage treatment Facility :
Q = 3,600㎥/d
establish a new structure. Sewage Pipeline = 7.2 km
Sewer latera: 166households
○ Expansion Project for Pocheon 2 Public Sewage Treatment Facility
Due to the increase in sewage volume caused by the expansion of the treatment area in Gunnae-myeon and Gasan-myeon, the capacity of the Pocheon 2 public sewage treatment facility is insufficient. Therefore, based on the "2035 Pocheon City Sewerage Development Basic Plan (September 2019)," the facility will be expanded to improve the water quality of the discharge area.
○ Pocheon Treatment Area Sewer Pipe Rehabilitation (Phase 6) Project
Based on the "2035 Pocheon City Sewerage Development Basic Plan (September 2019)," the purpose of this project is to improve the living environment of local residents and prevent water pollution in discharge rivers by diverting wastewater generated in the remaining sections of the Pocheon treatment area to interceptor pipes for treatment. This contributes to the healthy development of the city and improvement of public hygiene.