List
List
ENGINEERING
Water
Sewerage
Preliminary and Detailed Design for Maintenance Project of Decrepit Sewer Pipelines in the Jik-dong area
ClientPocheon-si
Year2021 - 2023
LocationPocheon, Korea
Scale
Sewage Pipeline = 17.7km
Manhole inspection: 9 locations
Sewer latera: 519 households
The purpose of this project is to contribute to the sound development and public hygiene improvement of the city by preventing water pollution in the discharged river by introducing sewage generated in the direct-dong treatment area (i.e., direct-dong) due to the expansion of the treatment area into the car collection pipe.