Preliminary and Detailed Design for Maintenance Project of Decrepit Sewer Pipelines in the Myeongnyun-4 area
ClientSeoul City
Year2023 - 2024
LocationSeoul, Korea
Scale
sewage pipeline : 35.5km
pump facilities : 2
low and Water Quality Inspection
Bad smell Inspection
· The purpose of this task is to derive improvement measures to improve sewage pipe function and quality, and to prepare detailed construction plans and maintenance plans to realize them.
· a detailed goal
1) Establishment of a High Quality Sewage Pipeline Maintenance Plan and Operation Plan
2) Improvement of Water Quality in Discharged Waters by Improvement of the Collection System through the Management of Discharge Concentration in Waters during Rainfall
3) Establishment of a flow rate and water quality monitoring system in all earths for sewage management and confirmation of project effectiveness
4) Preparation of Quality Improvement and Quality Control Plan for Sewage Pipeline