List
ENGINEERING Water Sewerage

Preliminary and Detailed Design for Namyang and Bibong Domestic Water Supply Development in Agriculture Area

ClientCheongyang County

Year- 2009

LocationHwaseong, Korea

Scale Transmission Pipe : L=100㎞
ø=200~50mm

The purpose of this project, located in the Namyang area of Cheongyang County, is to provide domestic and other water supplies. Due to the expansion of the water supply area, there is an increasing demand for water. Therefore, the project aims to establish an efficient and cost-effective facility plan to ensure stable supply of high-quality metropolitan water to both existing makeshift water supply areas and unsupplied areas. The goal is to effectively address future water supply demands.

  1. #Sewerage
  2. #Domestic
  3. #Gyeonggi-do
List