Preliminary and Detailed Design for Sejong-Cheongju Expressway (The 4th Section)
ClientKorea Expressway Corporation
Year2021 - 2022
LocationSejong, Korea
Scale
Road length(L)=3.4km
Width(B)=23.4m (4 Lanes)
Bridge : 3 Nos/105m
Tunnel : 2 Nos/600m
The establishment of a national inter-Korean network that completes the East-West 4 axis (Dangjin-Yeongdeok) of the National Highway Network Plan (10×10+6R2) is expected to link Chungcheong and Gyeongsang areas, strengthen accessibility to Sejong City and promote balanced national development, build a national arterial network by linking Dangjin-Daejeon, Cheongju-Sangju-Yeongdeok Expressway, and strengthen inter-road links.
To ensure smooth traffic flow, prevent accidents, and promote balanced national development, a project was carried out to establish a four-lane, dual carriageway expressway connecting Yeonseo-myeon in Sejong City to Nam-i-myeon in Seowon-gu, Cheongju City. Detailed design work for the fourth section of this project was conducted.