List
ENGINEERING Water Sewerage

Preliminary and Detailed Design for Sewerage Pipeline Maintenance Project in Ilwon-1 Sub-basin

ClientGangnam-gu office

Year2021 - 2023

LocationSeoul, Korea

Scale Overall excavation (D300–D1,200): L=5,728 m
Partial excavation (D300~D1,200): L=290m (55 locations)
Square water pipe: L=269 m
Replacement of manhole and newly established: 177 locations
Replacement and establishment of rainwater collection : 137 locations

The purpose is to derive improvement measures for enhancing the functionality and quality of sewer pipelines, and to develop detailed construction plans and maintenance schedules to realize these improvements.

  1. #Domestic
  2. #Sewerage
  3. #Seoul
List