Preliminary and Detailed Design for Sewerage Pipeline Maintenance Project in Ilwon-1 Sub-basin
ClientGangnam-gu office
Year2021 - 2023
LocationSeoul, Korea
Scale
Overall excavation (D300–D1,200): L=5,728 m
Partial excavation (D300~D1,200): L=290m (55 locations)
Square water pipe: L=269 m
Replacement of manhole and newly established: 177 locations
Replacement and establishment of rainwater collection : 137 locations
The purpose is to derive improvement measures for enhancing the functionality and quality of sewer pipelines, and to develop detailed construction plans and maintenance schedules to realize these improvements.