List
ENGINEERING Water Waterworks

Preliminary and Detailed Design for the construction of water supply facilities in the Yeongcheon High-Tech Park Zone

ClientYeongcheon City

Year2019 - 2021

LocationYeongcheon, Korea

Scale Topographic Survey: A=10,000㎡, Water Route Survey 5.5km
Geological Survey: 9 Boreholes (NX)
Pumping Test: 1 Borehole
Industrial Water Treatment Plant Installation: Q=3,200㎥/day
Water Intake Facility Installation: Q=3,500㎥/day
Reservoir Installation: V=600㎥(Domestic Water), V=1,600㎥(Industrial Water)
Pipeline Installation: D=250mm, L=2.2km(Industrial Water), D=150mm, L=6.7km(Domestic Water)

We plan to build water purification plants and install pipelines in Yeongcheon High-Tech Park to ensure stable water supply, enhancing local competitiveness and improving the living environment while boosting economic activity and regional competitiveness

  1. #Domestic
  2. #Waterworks
  3. #Gyeongsang-do
List