Preliminary and Detailed Design for the Industrial Water Pipeline Installation Project in Cheongyang General Industrial Complex
ClientCheongyang County
Year2024 - 2025
LocationCheongyang, Korea
Scale
Industrial water Pipe : L=12.5km
Emergency link pipe : L=2.0km
Pump Station : 2 locations
The purpose of this task is to install industrial water facilities (including transmission pipelines, pumping stations, and other ancillary equipment) in a timely manner to coincide with the occupancy schedule of the Cheongyang General Industrial Complex. This will prevent delays in the move-in schedule for companies planning to settle in the industrial complex and support smooth economic activities.