Preliminary and Detailed Design for the Installation (Expansion) of Sewer Pipelines [Upper Bansong Processing Subdivision]
ClientBusan Metropolitan City
Year2022 - 2023
LocationBusan, Korea
Scale
(1) Classification Sewer Pipes (D80~300㎜) Installation: L=12.848㎞, Serving 2,327 Households
(2) Manholes and Ancillary Facilities: Each 1 set
In the area of Bansong-dong in Haeundae-gu, where there is no classification sewer pipeline installed, untreated sewage is being discharged into nearby rivers such as Seokdaecheon and Suyeonggang. This untreated sewage discharge is exacerbating odor and river pollution. Therefore, by expanding the classification sewer pipeline network, we aim to improve the living environment for residents by mitigating odors from sewer pipelines in urban areas and enhancing the water quality of the discharged rivers. Additionally, this expansion will contribute to increasing the efficiency of public sewage treatment facilities.