List
ENGINEERING Water Waterworks

Preliminary and Detailed Design for the Sacheon Water Purification Plant Elevated Water Treatment Facility

ClientKorea Water Resources

Year2020 - 2024

LocationSacheon, Korea

Scale Topographic Survey: 13,000㎡
Route Survey: 0.42km
Geological Survey: 18 Boreholes
Model Experiment: 30㎥/day (2 sets)
Preliminary Detailed Design of Elevated Water Treatment Facility
- Capacity: Q=344,000㎥/day (including 19,000㎥/day for future expansion)
- Ozone Contact Facility, Activated Carbon Adsorption Facility, Auxiliary Facilities

To address increased vulnerability in water management due to frequent climate change impacts, including taste, odor, and trace hazardous substance responses, the aim is to install advanced water treatment facilities alongside the existing standard treatment process (coagulation-flocculation-sedimentation-filtration-disinfection) at the existing Sacheon water treatment plant.

  1. #Domestic
  2. #Waterworks
  3. #Gyeongsang-do
List