List
ENGINEERING Water Waterworks

Preliminary and Detailed Design for the Water Supply System Adjustment Project in the Southern Region of the Geumgang River (2nd)

ClientKorea Water Resources

Year2021 - 2023

LocationJeollabuk-do, Korea

Scale Adjustment of the water supply system : 109.2 thousand㎥/day
Establishment of pressurization facilities : 3 locations
Water pipe : 9.4㎞(D=600㎜)

By adjusting the water supply system between regions, we ensure the timely and stable supply of water according to the Saemangeum development plan.

  1. #Domestic
  2. #Waterworks
  3. #Jeolla-do
List