List
List
ENGINEERING
Water
Sewerage
Preliminary and Detailed Design for Wastewater Treatment Plant in Muwang and Gosong
ClientYangpyeong County
Year2018 - 2022
LocationYangpyeong, Korea
Scale
Construction of WWTP in Muwang(Q=80㎥/day), Gosong(Q=90㎥/day)
and sewer (L=23.2km)
The objective is to contribute to the healthy development of the region, improvement of public hygiene, and protection of the water quality of public water bodies through the installation of small-scale public sewage treatment facilities in Yangpyeong County, including Muwa and Gosong.