List
List
ENGINEERING
Water
Waterworks
Preliminary and Detailed Design for Water Supply Facility Project in the huewdae District of Baebang
ClientAsan City
Year2023 - 2024
LocationAsan, Korea
Scale
Drainage: 4,000㎥
Transmission and drainage pipes: D300 mm, L=4.2km
Supplementary facilities: architecture, machinery, electricity, instrument
The purpose is to design the Preliminary implementation of drainage reservoirs and transmission and drainage pipes for smooth water supply to the "Asan Baebang Portable District Urban Development Project" in Baebang Portable-ri.