List
List
ENGINEERING
Water
Sewerage
Preliminary and Detailed Design for Yongsan-22 Sogu Subarea Sewer Pipeline Rehabilitation Project
ClientSeoul City
Year2022 - 2024
LocationYongsan, Korea
Scale
Overall excavation (circular pipe, BOX) : L=4,747.6 m
Partial excavation (circular pipe) : L=362.5 m
Total repair (circular tube) : L=1,617.6m
New pipeline (circular pipe, BOX) : L=658.0m
The objective of this is to develop improvement measures for enhancing the functionality and quality of sewage pipelines and to formulate detailed construction and maintenance plans to implement these improvements.