List
ENGINEERING Water Sewerage

Preliminary Design for LCD industrial complex in Paju city(Phase Ⅳ)

ClientDaelim Industrial Co., Ltd

Year2016 - 2017

LocationPaju, Korea

Scale WWTP extension capacity: 50,000㎥/day(Tota capacity: 280,000㎥/day)

The objective is to handle the increased industrial wastewater and domestic sewage generated in the Paju LCD General Industrial Complex by expanding existing facilities. Through this expansion and in compliance with relevant regulations, the goal is to adequately treat and discharge these wastewater streams. This aims to prevent water quality pollution in public water areas and create a pleasant living environment for the local residents.

  1. #Sewerage
  2. #Turnkey
  3. #Domestic
  4. #Gyeonggi-do
List