List
List
ENGINEERING
Transport
Geotechnical / Tunnel
Preliminary & Detailed Design for National Road(No.23) & Access Road to Expressway (Jungri-Bongmyeong)
ClientLH (Korea Land Housing Corporation)
Year2010 - 2024
LocationYongin, Korea
Scale
Length : 10.8㎞, Width : 20.0m(4 lanes), Bridge : 17nr/1,766.4m,
Underpass : 2nr/1,114m, Tunnel : 2nr/1,230m
This project involves the establishment of a new interchange (IC) from Jungri to Bongbyeong to ensure smooth traffic flow and reduce travel time. A feasibility study and design work have been carried out for this project.
Conducting research and design services for the establishment and expansion of National Map Line 23 for the smooth implementation of measures to improve wide-area transportation for the Dongtan (2) new city housing site development project in Hwaseong.