List
List
ENGINEERING
Water
Sewerage
Sewer System Management (Phase Ⅲ)
ClientSejong Metropolitan Autonomous City
Year- 2013
LocationSejong, Korea
Scale
Project Area : 1.43㎢
Sewerage Pipe : 28㎞
Improvement of STP : 48m³/day
Pump Station : 4Points
Using the 1st and 2nd phase canal improvement projects, the basic and detailed designs for the establishment and improvement of sewage canals covering 28 km in the areas of Sinheung-ri and Beonam-ri in Jocheoneup, Yeongi County, were carried out. The existing public sewage system in Myeonghak-ri (48㎥/day) was improved to enhance operational efficiency and to achieve the goal of improving water quality in the Geum River Basin.