{"id":30677,"date":"2024-09-02T00:00:00","date_gmt":"2024-09-01T15:00:00","guid":{"rendered":"http:\/\/sunjin.jbrix.me\/post_works\/preliminary-concept-design-for-runway-wideness-and-infrastructure-rehabilitation-of-goheung-aviation-center\/"},"modified":"2024-09-02T00:00:00","modified_gmt":"2024-09-01T15:00:00","slug":"preliminary-concept-design-for-runway-wideness-and-infrastructure-rehabilitation-of-goheung-aviation-center","status":"publish","type":"post_works","link":"https:\/\/www.sunjin.co.kr\/en\/ourworks\/preliminary-concept-design-for-runway-wideness-and-infrastructure-rehabilitation-of-goheung-aviation-center\/","title":{"rendered":"Preliminary Concept Design for Runway Wideness and Infrastructure Rehabilitation of Goheung Aviation Center"},"featured_media":5077,"template":"","cat_works":[4107,4272,4102,4101],"tag_works":[4394,4104,4332,4159],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sunjin.co.kr\/en\/wp-json\/wp\/v2\/post_works\/30677"}],"collection":[{"href":"https:\/\/www.sunjin.co.kr\/en\/wp-json\/wp\/v2\/post_works"}],"about":[{"href":"https:\/\/www.sunjin.co.kr\/en\/wp-json\/wp\/v2\/types\/post_works"}],"version-history":[{"count":0,"href":"https:\/\/www.sunjin.co.kr\/en\/wp-json\/wp\/v2\/post_works\/30677\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sunjin.co.kr\/en\/wp-json\/wp\/v2\/media\/5077"}],"wp:attachment":[{"href":"https:\/\/www.sunjin.co.kr\/en\/wp-json\/wp\/v2\/media?parent=30677"}],"wp:term":[{"taxonomy":"cat_works","embeddable":true,"href":"https:\/\/www.sunjin.co.kr\/en\/wp-json\/wp\/v2\/cat_works?post=30677"},{"taxonomy":"tag_works","embeddable":true,"href":"https:\/\/www.sunjin.co.kr\/en\/wp-json\/wp\/v2\/tag_works?post=30677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}