List
List
ENGINEERING
Power
Electrical
Detailed Design for Filtration & Disinfection Facilities of Gyeongju Sewage Treatment Plant
ClientGyeongju City
Year2005
LocationGyeonju, Korea
Scale
R.E.C: 22.9kV, 3,000kVA
STP : Q=110,000/day
Filtration Facility : Φ1,500mm×H3,000mm×15(Fibered sand Filtration)
Disinfection Facility : 500A×1.5m×3(UV Disinfection)
The installation of filtration and disinfection facilities within the Gyeongju public sewage treatment facility, in conjunction with the existing treatment methods, aims to ensure a stable treated water quality and compliance with the strengthening discharge water quality standards.