List
ENGINEERING Power Electrical

Detailed Design for Filtration & Disinfection Facilities of Gyeongju Sewage Treatment Plant

ClientGyeongju City

Year2005

LocationGyeonju, Korea

Scale R.E.C: 22.9kV, 3,000kVA
STP : Q=110,000/day
Filtration Facility : Φ1,500mm×H3,000mm×15(Fibered sand Filtration)
Disinfection Facility : 500A×1.5m×3(UV Disinfection)

The installation of filtration and disinfection facilities within the Gyeongju public sewage treatment facility, in conjunction with the existing treatment methods, aims to ensure a stable treated water quality and compliance with the strengthening discharge water quality standards.

  1. #Sewerage
  2. #Domestic
  3. #Gyeongsang-do
  4. #Electrical
List