ENGINEERING
Power
Transmission Grid
Detailed Design for Sejong Area(Bukang-Wolsan Underground Work) Power Cable Duct Construction
ClientKorea Electric Power Corp.
Year2019 - 2021
LocationSejong, Korea
Scale
Size : 154kV Transmission Line(2Circuits)
154kV Distribution Line(3~18Circuits)
Total Length : L = 2,976m
- Shield TBM(Ø=8.0m) : L = 720m
- Box Culvert(B 2.1m x H 2.1m) : L = 2,256m