List
List
ENGINEERING
Power
Electrical
Preliminary Design and Detailed Design for Development Works of Water in Rural Area, Yeolha & Bongsan Area
ClientSejong County
Year2008
LocationSejong, Korea
Scale
Bongsan : V=600㎥/day
Transmission Pipe : L=9,315m D=75~350mm
Water pipe : L=9,879m D=16~75mm
This project, which covers part of Seomyeon and Jeondong-myeon in Yeongi County, involved geological surveys and water route measurements. The planning included the design of pumping stations and water supply and distribution pipelines, emphasizing the coordination with existing upper-level plans to ensure smooth water supply distribution.