ENGINEERING Power Transmission Grid

Detailed Design for Changwon-Gangseo Area(Shinhang branch) Power Cable Duct Construction

ClientKorea Electric Power Corp.

Year2023 - 2024

LocationChangwon, Busan, Korea

Scale Size : 154kV Transmission Line(4Circuits)
Total Length : L = 6,400m
- Shield TBM : L = 1,600m
- Duct : L = 4,800m